Project Information - Completed Projects
Welcome to the University of Hawaiʻi at Hilo's Facilities Planning & Construction Office. You may find information on current and completed projects on our website.
On this page:
- Completed Projects
- Psychology Laboratory Renovations
- HCC Diesel Shop Transformer Replacement
- Hale Ikena Transformer Replacement (Transformer T7 & T8)
- Panaewa Farm Renovations (Workshop)
- College of Natural and Health Sciences (CNHS)-Life Science Biology Building A Renovations (Rooms 3, 22, 1, 1A & 2)
- Administration Building Replace Soffits and Gutters
- Nurse Laboratory Renovations
- Hoku Kea Observatory Decommissioning
- UH Hilo Library Renovations
- Hale Kehau Food Service Equipment Replacement
- Imiloa Center Repair (Wall at Lobby Skylight)
- Repave Tennis Courts
- Hale Kēhau Dishwasher Replacement
- Aeronautical Flight Simulators
- Modernization & Repair of UH Telescopes on Mauna Kea
- Daniel K. Inouye College of Pharmacy
- PACRC Cover-All Roof
- Ingress & Egress - Phase 1 OMKM Visitor Information Station
- College Hall A&B Air Conditioning Improvements
- Life Science Building Renovation
- Energy Storage & Green Waste to Energy
- Repair & Renovate PB-8, PB-8A & PB-9
- Living Learning Community, Phase IIB
- Emergency Shelters for Student Housing
- Refinish Gym (Bldg. 320B) Floor
- Repave Tennis Courts
- Hale Kēhau Dishwasher Replacement
- Aeronautical Flight Simulators
Completed Projects
Psychology Laboratory Renovations
- Project Number:
UHH-16108 - Description: The project scope generally consists of renovations to the psychology laboratory, painting existing surfaces complete, including but not limited to interior walls/doors. Replace HVAC controls and distribution system. Remove existing flooring. New lighting system and acoustical ceiling. Installation of new ductless chemical fume hood, new eye wash, installation new biosafety cabinet and adequate power for four (4) freezers, replace all locksets with Salto electronic security card key system.
- Project Completion: August 2025
- Cost: $88,767.51 design/$697,300 construction (RIM FY22)
HCC Diesel Shop Transformer Replacement
- Project Number:
UHH-16092 - Description: The project generally consists of providing all labor, tools, materials, equipment and insurance necessary to replace an existing transformer with a new stainless-steel transformer at the University of Hawaiʻi main campus.
- Project Completion: August 2025
- Cost: $97,426.24 (CRDM Operating FY23)
Hale Ikena Transformer Replacement (Transformer T7 & T8)
- Project Number:
UHH-16114 - Description: The project generally consists of providing all labor, tools, materials, equipment and insurance necessary to replace an existing transformer with a new stainless-steel transformer at the University of Hawaiʻi at Hilo main campus.
- Project Completion: August 2025
- Cost: $171,193.05 (Housing to fund)
Panaewa Farm Renovations (Workshop)
- Project Number:
UHH-16065 - Description: The scope of work to include the design and construction of a new 1,400 square foot workshop together with plumbing, electrical, work benches, emergency shower and central vacuum system.
- Project Completion: August 2025
- Cost: $745,350.00 (RIM FY20)
College of Natural and Health Sciences (CNHS)-Life Science Biology Building A Renovations (Rooms 3, 22, 1, 1A & 2)
- Project Number:
UHH-16070 - Description: The scope of work will include design and construction for the renovations of two Biology classrooms. Includes selective demolition work, concrete work, structural steel work, carpentry, architectural finishes, laboratory equipment, plumbing, air conditioning and ventilation, electrical, telecommunication, fire alarm and all incidental related work. Work also to include removal, disposal and remediation of hazardous materials and all incidental works.
- Project Completion: July 2025
- Cost: $2,630,457.00 (RIM FY20)
Administration Building Replace Soffits and Gutters
- Project Number:
UHH-16123 - Description: The project scope generally consists of the replacement of the existing exterior soffits and gutters.
- Project Completion: June 2025
- Cost: $63,139.77 design (CRDM Operation) / $257,300.00 construction (CRDM Operating)
Life Science Biology Building A Renovations
- Project Number:
UHH-16070 - Project Completion: June 2025
- Cost: $2,495,934.15
Nurse Laboratory Renovations
- Project Number:
UHH-16071 - Description: The scope of work will include design and construction for the Nursing Laboratory include selective demolition work, concrete work, structural steel work, carpentry, architectural finishes, laboratory equipment, plumbing, air conditioning and ventilation, electrical, telecommunication, fire alarm and all incidental work. Work also to include removal, disposal and remediation of hazardous materials and all incidental work.
- Project Completion: January 2025
- Cost: $593,700.00 (RIM FY21/22)
Hoku Kea Observatory Decommissioning
- Project Number:
UHH-16029 - Description: The project scope generally consists of decommissioning and removal of the Hoku Kea Observatory Building, Generator Building and associated telecommunications and electrical infrastructure.
- Project Completion: June 2024
- Cost: $792,450.00 (CIP FY21)
UH Hilo Library Renovations
- Project Number:
UHH-16067 - Description: The project generally consists of planning, design and construction to the repair and improvement of the library building and infrastructure though modernization efforts. The project will include but not limited to student spaces expanding the Hawaiian Collection, creating 24/7 space on the second-floor accessible space, compliant with fire code and new graphics along the rear wall, removal of moveable shelving and R-track system, install glass walls and entry to Kilohana Tutoring Center, mechanical/electrical systems improvements.
- Project Completion: March 2024
- Cost: $871,900.00 (RIM FY20)
Hale Kehau Food Service Equipment Replacement
- Project Number:
UHH-16075 - Description: The project generally consists of consultant services and construction to removal and replacement of the existing walk-in refrigerators and freezer and the repair/replacement of the existing fresh air supply at the serving area.
- Project Completion: January 2024
- Cost: $295,000 ($180,000 Energy Reinvestment/$115,000 Housing)
Imiloa Center Repair (Wall at Lobby Skylight)
- Project Number:
UHH-16107 - Description: The project generally consists of work to re-caulk existing metal framed dome skylight and repair gypsum board at the Lobby skylight area.
- Project Completion: December 2023
- Cost: $193,717.20 (Imiloa)
Repave Tennis Courts
- Project Number:
UHH-2016-618 - Description: This project will remove the existing Tennis Court pavement and replace with new.
- Project Completion: May 2022
- Cost: $1,049,000.00
Hale Kēhau Dishwasher Replacement
- Project Number:
UHH-16032 - Description: This project will replace the dishwasher in Hale Kēhau Dining Hall.
- Project Completion: May 2022
- Cost: $342,702.17
Aeronautical Flight Simulators
- Project Number:
UHH-16074 - Description: This project will provide construction and equipment for necessary repairs and maintenance for UH Hilo's Aeronautical Sciences Program CRX Open Cockpit Simulators, Desktop Simulators, maintenance and software upgrades.
- Project Completion: May 2022
- Cost: $237,388.00
Modernization & Repair of UH Telescopes on Mauna Kea
- Project Number:
UHH-2015-502 - Description: This project will provide modernization and repair of UH Telescopes on Mauna Kea.
- Project Completion: April 2021
- Cost: $4,990,918.41
Daniel K. Inouye College of Pharmacy
- Project Number:
UHH-09-348 - Description: This project will provide a permanent facility for the proposed College of Pharmacy.
- Project Completion: November 2019
- Cost: $33,797,641.47
PACRC Cover-All Roof
- Project Number:
UHH-2016-605 - Description: This project will replace the tensile membrane roof in PACRC (Pacific Aquaculture and Coastal Resources Center).
- Project Completion: September 2019
- Cost: $817,561.74
Ingress & Egress - Phase 1 OMKM Visitor Information Station
- Project Number:
UHH-2014-407 - Description: This project will provide design and construction for infrastructure improvements and renovation within UH's Managed Lands on Mauna Kea including the Mid-Level Facilities at Hale Pōhaku, the Summit Access Road, and the Mauna Kea Science Reserve.
- Project Completion: August 2019
- Cost: $1,465,380.24
College Hall A&B Air Conditioning Improvements
- Project Number:
UHH-2016-603A - Description: This project will replace the existing 80 ton air cooled chiller.
- Project Completion: July 2019
- Cost: $782,105.31
Life Science Building Renovation
- Project Number:
UHH-2011-105 - Description: This project will provide various renovations to Life Science Building Complex including roofing, HVAC, electrical finishes and lab renovations.
- Project Completion: May 2019
- Cost: $5,135,130.69
Energy Storage & Green Waste to Energy
- Project Number:
UHH-2016-604 - Description: This project will provide construction of a energy storage device to manage peak electrical demand.
- Project Completion: February 2019
- Cost: $853,345.00
Repair & Renovate PB-8, PB-8A & PB-9
- Project Number:
UHH-2012-202B - Description: This project will provide repairing and renovating Portable Buildings 8, 8A & 9 to reduce UH Hilo's backlog.
- Project Completion: October 2018
- Cost: $2,135,703.92
Living Learning Community, Phase IIB
- Project Number:
UHH-2011-123B - Description: This project will provide PV panels on Living Learning Community Facilities.
- Project Completion: January 2018
- Cost: $168,304.42
Emergency Shelters for Student Housing
- Project Number:
UHH-2013-310 - Description: This project will retrofit the Ground Floor of Hale Kauanoe for use as an emergency shelter.
- Project Completion: September 2017
- Cost: $2,954,759.59
Refinish Gym (Bldg. 320B) Floor
- Project Number:
UHH-2016-606 - Project Completion: July 2017
- Final Contract Amount: $104,195.97
- Consultant: Yamasato Higa Architecture & Planning, Inc.
- Contractor: IPR, Inc. dba IPR Hawaii
- Project Manager: Jerry Watanabe
- Construction Manager: Brian Hill
- Description: This project will resurface and re-stripe the existing Gym floor.
Repave Tennis Courts
- Project Number:
UHH-2016-618 - Project Completion: May 2022
- Final Contract Amount: $1,049,000.00
- Consultant: SSFM International, Inc.
- Contractor: Site Engineering, Inc.
- Project Manager: Jerry Watanabe
- Construction Manager: Brian Hill
- Description: This project will remove the existing Tennis Court pavement and replace with new.
Hale Kēhau Dishwasher Replacement
- Project Number:
UHH-16032 - Project Completion: May 2022
- Final Contract Amount: $342,702.17
- Consultant: Okahara and Associates, Inc. dba DMT Consultant Engineers
- Contractor: Isemoto Contracting Co., Ltd.
- Project Manager: Ligaya Hill
- Construction Manager: Brian Hill
- Description: This project will replace the dishwasher in Hale Kēhau Dining Hall.
Aeronautical Flight Simulators
- Project Number:
UHH-16074 - Project Completion: May 2022
- Final Contract Amount: $237,388.00
- Consultant: UH Hilo Facilities Planning & Construction
- Contractor: Jetline Systems Corp.
- Project Manager: Jerry Watanabe
- Construction Manager: Jerry Watanabe
- Description: This project will provide construction and equipment for necessary repairs and maintenance for UH Hilo's Aeronautical Sciences Program CRX Open Cockpit Simulators, Desktop Simulators, maintenance and software upgrades.