UH Hilo Facilities Planning & Construction

Project Information - Current & Future Projects

Welcome to the University of Hawaiʻi at Hilo's Facilities Planning & Construction Office. You may find information on current and completed projects on our website.

On this page:

Active Projects

Campus Center CRDM

  • Project Number: UHH-16081
  • Description: The project consists of planning, design and construction for the repair and improvement of the Campus Center building and infrastructure. Project generally consists of modernization of interior and exterior of the building including roofs, walls, doors and upgrade electrical/mechanical systems and pedestrian pathways.
  • Status:
    • Notice to Proceed: March 20, 2023
    • On site start date: March 21, 2023
    • Estimated completion date: August 2025
  • Budgeted Amount: $3,066,272.00 (RIM FY20)

College of Pharmacy Modular Building Renovations

  • Project Number: UHH-16037
  • Description: The project generally consists of renovations to the Pharmacy Modular Building B classrooms to become research laboratories, Building B will be renovated to include a large mutli-purpose room and lunchroom and construction of a new NMR building.
  • Status: Ongoing
    • Notice to Proceed: August 17, 2020
    • On site start date: August 17, 2020
    • Estimated completion date: TBD
  • Budgeted Amount: $7,386,849.00 (to date)

UH Hilo Student Life Swimming Pool Renovations

  • Project Number: UHH-16068
  • Description: The project scope generally consists of consultant services and construction for the conversion of the Student Life Center swimming pool from the current liquid chemical chlorination system to a saltwater chlorination generation system and the relocation of the existing filtration pump to a location more accessible for repairs and protection from weather.
  • Status:
    • Notice to Proceed: March 1, 2023
    • On site start date: March 1, 2023
    • Estimated completion date: August 2025
  • Budgeted Amount: $610,000.00 (Student Life to fund)

CAFNRM Building Air Conditioning Improvements

  • Project Number: UHH-16078
  • Description: The project generally consists of consultant services and construction to add to new exterior AC unit, replacing HVAC equipment and controls, replacing refrigerant piping and insulation and all related electrical work.
  • Status:
    • Notice to Proceed: May 14, 2024
    • Estimated completion date: October 2025
  • Budgeted Amount: $117,789.22 design / $950,000.00 construction (RIM FY22)

Hale Ikena Replace Exhaust Fans

  • Project Number: UHH-16084
  • Description: The project scope generally consists of the replacement of all exhaust fans on Buildings A through H.
  • Status:
    • Notice to Proceed: May 24, 2024
    • Estimated completion date: January 2026
  • Budgeted Amount: $800,525.00 (UH Hilo Housing to fund)

Edith Kanakaole Hall Renovations

  • Project Number: UHH-16109
  • Description: The project scope generally consists of complete renovation of the building. Work to include paint exterior surfaces complete and interior walls/doors, electrical equipment upgrades (panels, switchboards, transformers, disconnects, etc.), replacing all light fixtures with LED fixtures, replacing all locksets with Salto electronic security cards key system, replace fire detection/fire protection systems.
  • Status:
    • Notice to Proceed: June 7, 2024
    • Estimated construction start date: September 20, 2024
    • Estimated completion date: TBD
  • Budgeted Amount: $357,889.04 design (RIM FY22) / $3,000,000.00 construction (RIM FY23)

Science Technology Building Mechanical Systems Improvements

  • Project Number: UHH-16100
  • Description: The project scope generally consists of demolition of existing HVAC insulation and replacing new refrigerant insulation and installing new pre-cooler to HVAC unit, related electrical work and hazmat removal.
  • Status:
    • Estimated completion date: October 2025
  • Budgeted Amount: $70,610.00 design (Energy Reinvestment) / $1,000,000.00 construction (RIM FY24)

Chiller Building Replace Existing York Chiller

  • Project Number: UHH-16125
  • Description: The project scope generally consists of the replacement of the existing York Chiller, new cooling tower and all associated appurtenances.
  • Status:
    • Estimated construction start date: January 2027
    • Estimated completion date: TBD
  • Budgeted Amount: $3,500,000.00 (RIM FY26)

Student Life Center Mechanical System Improvements

  • Project Number: UHH-16099
  • Description: The project scope generally consists of the installation of a new central ducted air conditioning system for the weight/fitness area and replacement of the exhaust fans in the menʻs and womenʻs locker rooms.
  • Status:
    • Notice to Proceed: August 2024
    • Estimated construction start date: December 2025
    • Estimated completion date: January 2026
  • Budgeted Amount: $99,711.79 design / $656,826.00 construction (Student Life to fund)

Theater Building Mechanical Systems Improvements

  • Project Number: UHH-16101
  • Description: The project scope generally consists of the installation of the replacement of the existing air conditioning equipment in the central chilled water plant yard including two air cooled chillers, chilled water pumps, chemical feed system, expansion tank, variable frequency drives, piping, valves and supports and a dry cooler. In addition, a dehumidifier in the costume storage room.
  • Status:
    • Notice to Proceed: November 2024
    • Estimated construction start date: TBD
    • Estimated completion date: TBD
  • Budgeted Amount: $109,454.00 design (Energy Reinvestment) / $1,500,000.00 construction (RIM FY24)

College of Agriculture Re-Roof and Replace Gutters

  • Project Number: UHH-16140
  • Description: The scope of work will include design and construction for the re-roof and replace gutters of the College of Agriculture building. Includes removal work and replacement of existing metal roof and gutters, painting, carpentry work and all incidental related work.
  • Status:
    • Notice to Proceed: April 9, 2025
    • Estimated construction start date: TBD
    • Estimated completion date: January 2026
  • Budgeted Amount: $95,349.54 design (UH Hilo CRDM FY24) / $655,000 construction (UH Hilo CRDM FY24)

Projects Currently Out to Bid

Renovation and Repair PB-10 to PB-14 Native Hawaiian Spaces PB-11 - PB-14

  • Project Number: UHH-16093
  • Description: The general scope of work consists of planning, design and construction to include folding partitions between classroom 1 and computer lab at PB-12 and replace flooring. Replace existing AC of meeting room at PB-10 and repair roof leak and water damaged ceiling. Replace existing bottle filler at PB-10 lanai and at two other places. Add small kitchen area at computer lab. Replace existing plexiglass window covers at PB-10.
  • Status:
    • Estimated construction start date: TBD
    • Estimated completion date: TBD
  • Budgeted Amount: $239,850.60 design (CRDM Operating) / $2,147,450.00 construction (Kipuka Native Hawaiian Student Center grants)

Student Service Building Mechanical Systems Improvements

  • Project Number:
  • Description: This project is replacement of existing Chillers No. 1 and 2. The scope of work includes selective demolition, removal of chiller No. 1 and 2 equipment including air cooled chillers, chilled water pumps, dry cooler and associated piping, pipe insulation chemical pot feeders, instrumentation and controls, electrical and miscellaneous related work and replace with new Chiller No. 1 and all necessary equipment and appurtenances.
  • Status:
    • Notice to Proceed: May 29, 2025
    • Estimated construction start date: TBD
    • Estimated completion date: October 2026
  • Budgeted Amount: $2,760,000 construction (FY26)

Projects In Design Phase

East Hawaiʻi Historic Preservation Center

  • Description: The project generally consists of planning, design and construction of a new East Hawaiʻi Historic Preservation Center. Major programmatic functions to include the following: repository for native Hawaiʻi and other artifacts from the State of Hawaii; a place where collections can be stored and maintained in perpetuity, allow for visual and possibly interactions between visitors, students, employees and the collections; allow the visitors to observe the curation process; introduce visitors to an interactive work environment; include a cultural area in the facility where student can intern with DLNR-SHPD; include educationl classrooms, office/administrative spaces, conference rooms and outdoor lanai areas where students, employees and visitors can congregate.
  • Status: Project managed by DLNR-SHPD
    • Estimated construction start date:
    • Estimated completion date:
  • Budgeted Amount: Funded by DLNR-SHPD

University Classroom Building (UCB) Renovations

  • Project Number:
  • Description: The project scope generally consists of planning, design and construction to include demolition work, paint exterior surfaces complete and interior walls/doors and replace flooring, replace all locksets with Salto electronic security key card system.
  • Status:
    • Estimated construction start date: TBD
    • Estimated completion date: TBD
  • Budgeted Amount: $500,000 (RIM FY24) / $4,500,000 construction (RIM FY25)

Library Air Conditioning Improvements

  • Project Number: UHH-16146
  • Description: The project generally consists of planning, consultant services and construction to include hazmat removal, demolishing existing HVAC equipment/piping and controls, replace HVAC equipment and controls, replace refrigerant piping and insulation and any related electrical work.
  • Status:
    • Estimated construction start date: TBD
    • Estimated completion date: TBD
  • Budgeted Amount: $1,500,000 (RIM FY24) / $8,000,000 construction (RIM FY25)

Athletics Repairs CRDM Removal

  • Project Number: UHH-16141
  • Description: The project generally consists of planning and architectural design. Construction to include demolish interior walls and ceilings, remove and replace existing lockers, repair and renovate restroom facilities, replace existing light fixtures, repair and renovate existing office buildings, replace the temporary canopy with a permanent roof structure, replace HVAC equipment and controls.
  • Status:
    • Estimated construction start date: TBD
    • Estimated completion date: TBD
  • Budgeted Amount: $650,000 design (RIM FY24) / $6,859,000 construction (RIM FY24)

RIM/Portable PB 5-7 CRDM Removal

  • Project Number:
  • Description: The project scope generally consists of architectural revisions to design and construction to include replacing existing metal roof and wooden sun shade system, replace wooden lanai handrails, repair damaged structural floor framing, install new ADA unisex bathroom, replace all interior existing chalkboards with whiteboards, replace all light fixtures with LED fixtures, replace existing window AC system with new split system, replace existing locksets with Salto electronic security key card system.
  • Status:
    • Estimated construction start date: TBD
    • Estimated completion date: TBD
  • Budgeted Amount: $3,000,000 construction (RIM FY24)

Panaewa Farm Horse Barn Renovations Phase 2

  • Project Number: UHH-16106
  • Description: The scope of work will include design and construction for the renovations of the horse barn facility including selective removal work, concrete rehabilitation, re-roofing and roof extension, painting, carpentry work, architectural finishes and all incidental related work. Replace all locksets with Salto electronic security key card system. The project is essential for the removal of backlog and provide adequate facilities to meet program needs.
  • Status:
    • Estimated construction start date: TBD
    • Estimated completion date: TBD
  • Budgeted Amount: $2,500,000 (RIM FY26)

Marine Science and Wentworth Hall Re-Insulate AC Ductwork and Refrigerant Piping

  • Project Number:
  • Description: The scope of work will include design and construction of re-insulating the air conditioning ductwork and refrigerant piping. Includes removal work and replacement of insulation, gypsum wall board, painting, carpentry work and all incidental related work.
  • Status:
    • Estimated construction start date: TBD
    • Estimated completion date: TBD
  • Budgeted Amount: $3,500,000 (RIM FY26)

Theater Renovations

  • Project Number:
  • Description: The scope of work will include design and construction of the Theater Building including selective demolition work (includes HAZMAT removal), concrete rehabilitation, exterior painting, carpentry work, architectural finishes. and all incidental related work. Replacement of all locksets with Salto electronic security card key system to be done. The project is essential for the removal of backlog and provides adequate facilities to meet program needs.
  • Status:
    • Estimated construction start date: June 2027
    • Estimated completion date: TBD
  • Budgeted Amount: $6,000,000 (FY25)

College Hall C Renovations

  • Project Number:
  • Description: The scope of work will include design and construction for the renovations of College Hall C including selective demolition work (includes HAZMAT removal), repainting interior and exterior of the building, re-roof, carpentry work, architectural finishes, plumbing fixtures, replacing existing HVAC equipment, and all incidental related renovation work.
  • Status:
    • Estimated construction start date: TBD
    • Estimated completion date: TBD
  • Budgeted Amount: $400,000 design / $3,600,000 construction (FY26)

Small Business Incubator Building Mechanical Systems Improvements

  • Project Number:
  • Description: This project is a replacement of existing PAC-1 & PAC-2 and AHU-1 and ACCU-1. The scope of work includes selective demolition, removal of PAC-1 & PAC-2 and AHU-1 & ACCU-1 equipment and all associated piping, pipe insulation, instrumentation and controls, electrical and micellaneous related work and replace with new PAC-1 & PAC-2 and AHU-1 & ACCU-1 and all necessary equipment and appurtenances.
  • Status:
    • Estimated construction start date: January 2027
    • Estimated completion date: TBD
  • Budgeted Amount: $2,200,000 (RIM FY26)

Projects To Begin Design Phase

Hale Ikena Renovations Phase 1: Buildings A & B (Design)

  • Description: The scope of work to include design and construction for the Phase 1 renovations of the Hale Ikena Housing facilities (Buildings A & B) to include selective removal work, concrete rehabilitation, exterior and interior painting, carpentry work, architectual finishes and all incidental related work. The project is essential for the removal of the backlog and provides adequate facilities to meet the program needs.
  • Budgeted Amount: $550,000 (RIM FY26)

Imiloa Astronomy Center Remove and Replace Built-up Roof (Design)

  • Description: The scope of work to include design and construction for the removal and replacement of the building's built-up roofing, work to include removal of existing built-up roofing, re-roofing, painting, carpentry work, architectural finishes and all incidental related work. The project is essential for the removal of the backlog and provides adequate facilities to meet the program needs.
  • Budgeted Amount: $250,000 (RIM FY26)